Follow

Operation is not allowed. One or more machines have a job in progress or the cluster is not valid.

operation_not_allowed.png

 

1. Reset Design  reset design.png

2. If the situation remains unresolved, you will need additional technical assistance. Here are the available Melco Technical Support options.

a. You might need to Trim Immediate before Framing Forward.

 

Was this article helpful?
0 out of 0 found this helpful